TMALogo
HomeNontraditionalGadag Railway StationFoot Over Bridge Board

Foot Over Bridge Board on Gadag Railway Station

Gadag Railway Station
Old FOB
sideBorder

Used For

Impact

sideBorder

Ad Type

Image

sideBorder

Lead Time (in days)

2

sideBorder

Span

30 days

Ads will be displayed on Boards that are placed on Foot Over Bridge across the station. According to availability and requirement, a particular Foot Over Bridge can be chosen to place the advertisement.

Rack Rate

₹ 28,000 / Per Package Per Month

party-popper

TMA Offer

Login To View

Min Billing

₹ 25,000

Execution Details

Width

3

Height

5

Unit

ft

Format

PDF/CDR/AI

Total Area

15 Sqft

Width

5

Height

15

Unit

ft

Format

PDF/CDR/AI

Total Area

75 Sqft

Proof Of Execution

Photos/Images of executed media will be shared in a PPT format.

First Proof Of Execution(In Days)

2

Proof Of Execution Frequency

Start and End of the campaign

End of the campaign execution proof (In Days)

5