Digital Screen on Goa (Dabolim) Airport

Goa (Dabolim)  Airport
Popular
Arrival Aerobridge corridor, Baggage belt hall,  Arrival exit gates
Arrival Aerobridge corridor, Baggage belt hall,  Arrival exit gates
Arrival Aerobridge corridor, Baggage belt hall,  Arrival exit gates
Mounted on Baggage Belt 1,2,3,4,5,6
Mounted on Baggage Belt 1,2,3,4,5,6
Mounted on Baggage Belt 1-4
Departure, Entry, Check-In area, Security check, SHA
Departure, Entry, Check-In area, Security check, SHA
Arrival Aerobridge corridor, Baggage belt hall,  Arrival exit gates
sideBorder
Used For

Impact

sideBorder
Ad Type

Video

sideBorder
Lead Time (in days)

3

sideBorder
Span

10 days

Digital screens with a 15-second ad duration and 8 advertising slots per loop are strategically installed across high-visibility arrival zones, including the Arrival Aerobridge Corridor (passenger walkway post landing), Baggage Belt Hall (primary waiting and baggage collection area), and Arrival Exit Gates (final passenger movement point). Additional screens are mounted above Baggage Belts 1–6 and 1–4, positioned directly over conveyor systems to capture maximum attention during extended dwell time, ensuring consistent and repeated brand exposure.

Rack Rate

₹ 33,000 / Per Package Per Day

party-popper

TMA Offer

Login To View

Min Billing

₹ 3,00,000

Min Billing

₹ 3,00,000

Execution Details

Creative Spec: video

Detailed Dimension

Click here

Format

.Mp4

SOP

Proof Of Execution

Photographs with newspaper date

First Proof Of Execution(In Days)

2

Proof Of Execution Frequency

Start and End of the campaign

End of the campaign execution proof (In Days)

2